What the opportunity means
Digitise Berlin infrastructure files into nscale/eAkte: collection, preparation, 300-dpi scanning, German OCR, PDF/A-2u, metadata, CAD reconstruction, return and optional certified destruction.
Land Berlin, Senatsverwaltung für Mobilität, Verkehr, Klimaschutz und Umwelt
Do not prime: software/OCR is only one part of an indivisible physical scan-bureau, logistics, CAD and certified-destruction contract. Formal self-performed reference evidence is absent.
Digitise Berlin infrastructure files into nscale/eAkte: collection, preparation, 300-dpi scanning, German OCR, PDF/A-2u, metadata, CAD reconstruction, return and optional certified destruction.
Partial technical fit for OCR and document pipelines; material delivery and qualification gaps for physical operations, self-performed references, CAD/BIM reconstruction, RESISCAN handling and destruction.
OCR and document-ingestion competence is demonstrated, but this indivisible price-only contract is dominated by physical scan-bureau operations, secure logistics, CAD reconstruction and certified destruction; no existing product or formal prime-reference evidence covers that chain.
Portfolio evidence
Decision gates
Digital David AG is registered at Amtsgericht Frankfurt am Main, HRB 121238; proof may be requested.
each reference must cover analog-file scanning with OCR plus conversion/OCR of existing digital documents, performed eigenverantwortlich and not as subcontractor; written client confirmations may be requested. The qualification pack has no approved formal references and portfolio descriptions do not prove this gate.
procedure-specific legal declarations are not present in the company evidence pack.
no procedure-specific declaration evidence is available.
OCR/document-pipeline competence is demonstrated, but no evidence pack proves a complete BSI TR-03138 physical scan operation.
no facilities, destruction certification or logistics evidence exists; never infer these from software portfolio evidence.
no formal CAD/BIM delivery evidence is present.
secure cloud competence is demonstrated, but the evidence pack does not prove a compliant Germany-only operating arrangement for this contract.
Interpreted scope
Bid package
Commercial reading
Evidence trail
Authoritative RIB Q&A checked 2026-08-16T22:12:19+02:00: portal explicitly states there are no answers to any questions yet. Questions close 2026-08-18T23:59:00+02:00.
Package reviewed 16 Aug 2026, 22:12
Research files